Gas Well Conductor Installation 1

Client: Nexen Petroleum UK Limited
Location: Fradley Junction, Birmingham

Application: Set conductor casing for exploration well

Job Description:

Using our impressive DR-24 drilling rig we set 160 feet of 12" surface casing and cemented it in place. The dual rotary drilling technique was easily able to overcome the unstable overburden found in this area.

Click here for more information on Dual Rotary Drilling

Equipment Used:

Rig 1 DR24, Volvo FM9 8x4 Flatbed with Long reach Crane

Drilling Methods: Dual Rotary Drilling and down the hole hammer and air flush
Ground Conditions: Clays on to Mudstones