Hydrofracturing

Maximising Well Yield 1

Client: Pig Farmer
Location: Co. Donegal

Application: Hydrofracturing
Geology: Schist

Job Description:

Meehan Drilling carried out a Hydrofracturing programme on a 100m borehole at several levels. When the well was originally drilled it had a yield of approximately 140L per hour and subsequently after Hydrofracturing the yield was increased to 1,550 L per hour.

Equipment Used:

Hydrofracturing unit